Kitchen – Day 6

Sink time!!! I have to admit, it was nice getting the sink back in order, it was getting a bit tedious having to run upstairs every time I wanted some water πŸ™‚

Day 6 was dedicated to installing the tap and installing the plumbing for the kitchen sink and dishwasher. It was a little bit of fiddly work, but kinda fun.

First one out was the tap! My new sink is not quite the same as my old one (the old one had gone out of production), so the measurements are a little different, and because of this, the hole for the tap was not quite in the same place as my old one. So we had to do some adjustments to the piping to make everything fit. It’s not difficult work, but for some reason (just like with everything else) it’s time consuming. Β It was wonderful getting the tap in, tested out and have everything work like a charm.

Sink time! Remember I had practised where all the plumbing would go? Well, this served us well. It made the installation much quicker and easier since we knew which pipe had to be cut and knew which pipes to connect to each other. It didn’t take long before the plumbing for the sink was in, and it was time to test everything. and presto… no leakage, hurray!!!

Dishwasher next, this actually took a minute, not because it was difficult to install the piping and water, but because we had to spend some time getting the machine just perfectly situated in it’s spot, level it out and fasten it to the countertop, to make sure it didn’t move while pulling at the door.

Day 6 concluded with functioning tap, sink and dishwasher… I’m back in business πŸ™‚

2014-11-03 10.02.05

2 thoughts on “Kitchen – Day 6

What do you think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.